EXPLORE

infocus

  • PROJECT

    West Cumbria Mining

  • SERVICES

    Civil, Structural and Architectural

Westlakes worked with West Cumbria Mining to assist with the production of pre-feasibility studies into two proposed sites.  After identification of the preferred site, the site layout was developed, in consultation with the client’s team of environmental consultants, mining engineers and planning consultants.

The final design that was included in WCM’s planning proposal also included the proposed route for an underground conveyor from the main mine site to a proposed rail loading facility, also developed as part of the project.

Images courtesy of West Cumbria Mining

VIEW SIMILAR PROJECTS
                          WP_Post Object
(
    [ID] => 343
    [post_author] => 3
    [post_date] => 2017-09-18 13:57:15
    [post_date_gmt] => 2017-09-18 13:57:15
    [post_content] => Westlakes were appointed as Civil Engineering Design Support for the Iggesund Paperboard £108M 50MW Biomass Plant.

Structures were designed to include concrete basements up to 6m deep, which were built in waterlogged ground, and a complex triangular A-frame store 80m long and 30m high.

The civil layouts were designed around the process layouts and has involved the specialist design of a number of machine foundation bases, our scope was then extended to include the design of further structures as well as highways and drainage, weighbridges and entrance facilities, substations, cable bridges and control facilities.
    [post_title] => Iggesund Biomass Plant
    [post_excerpt] => Civil Engineering Design Support for the Iggesund Paperboard £108M 50MW Biomass Plant.

    [post_status] => publish
    [comment_status] => closed
    [ping_status] => closed
    [post_password] => 
    [post_name] => biomass-plant
    [to_ping] => 
    [pinged] => 
    [post_modified] => 2018-05-25 07:21:51
    [post_modified_gmt] => 2018-05-25 07:21:51
    [post_content_filtered] => 
    [post_parent] => 0
    [guid] => http://westlakes.1devserver.co.uk/?post_type=project&p=343
    [menu_order] => 3
    [post_type] => project
    [post_mime_type] => 
    [comment_count] => 0
    [filter] => raw
)
                        
                          WP_Post Object
(
    [ID] => 942
    [post_author] => 3
    [post_date] => 2017-09-25 08:55:00
    [post_date_gmt] => 2017-09-25 08:55:00
    [post_content] => Hinkley Point C will be the first new nuclear power plant in the UK in 20 years following an agreement between the government and EDF Group. The 430 acre site will generate enough electricity to power nearly 6 million homes.

Westlakes was engaged by the ONR to provide civil engineering support and specialist assistance to ONR site inspections at the Hinkley Point C site, particularly relating to the main areas of interest below:

• Verifying that the site geology is in accordance with design assumptions
• Oversight of earthworks trials, specifications and compliance with arrangements
• Oversight of concrete mix trials, mix designs, specifications and compliance with arrangements
    [post_title] => Civil Engineering Support at Hinkley Point C
    [post_excerpt] => Civil engineering support specialist assistance for the construction of the new nuclear power station at Hinkley Point.
    [post_status] => publish
    [comment_status] => closed
    [ping_status] => closed
    [post_password] => 
    [post_name] => civil-engineering-support-at-hinkley-point-c
    [to_ping] => 
    [pinged] => 
    [post_modified] => 2018-05-25 07:24:29
    [post_modified_gmt] => 2018-05-25 07:24:29
    [post_content_filtered] => 
    [post_parent] => 0
    [guid] => http://westlakes.1devserver.co.uk/?post_type=project&p=942
    [menu_order] => 4
    [post_type] => project
    [post_mime_type] => 
    [comment_count] => 0
    [filter] => raw
)